• WWW.STICKYBOTTLE.COM
    Better from Irelands Dunbar as OConnor lets rip at La Vuelta | Video
    Ben OConnor enjoyed one of the rides of his life on La Vuelta 2024 today, winning the stage with great authority and going into the race lead. And just 24 hours after losing the kind of time that suggested he would not challenge for the overall, the Australian is now a real contender to win []The post Better from Irelands Dunbar as OConnor lets rip at La Vuelta | Video appeared first on Sticky Bottle.
    0 Comments 0 Shares 194 Views
  • BIKERUMOR.COM
    Wilde Bicycle Co. Adds Two Lugged Gravel Beauties w/ Classical or Modern Style
    Setup at the MADE Show is in full swing, which means were already starting to see some new products spring up. Earlier this week, Wilde Bicycle Co. effectively teased one of their new models by introducing a 1 threaded headset with Cane Creek. Wilde actually used photos of their new Sugar Foot sporting the new headset, which now gets officialSugar FootCalling it a classically styled 650b gravel racer, the Sugar Foot features a Richard Sachs-designed lugset, a Pacenti fork crown, Columbus steel tubing, and Paragon Machine Works frame parts with Imron paint by D&D Cycles. Built around rim brakes and 650b wheels and tires, Wilde claims the bike may look classic, but is really an undercover go-fast machine. Wilde only plans to do a run of 10 of these bikes over the winter, with paint similar to the show bike pictured here. Available sizes have effective top tube lengths of 54, 56, 58, or 60cm. Orders on the Wilde site reserve your spot, with expected delivery in March/April 2025. Sold as a frameset, pricing is set at $3,900. FRAMEThree sets of bottle bossesInternal rear brake cable routingFender mountsRack mountsClearance for up to 650b x 2.2 tires132.5 rear spacingSTEEL FORKFender mountsMid-blade rack mountInternal dynamo routingTire clearance 650b x 2.4 tireLugged Earth ShipFor something a little more modern but still featuring traditional joinery, the new Lugged Earth Ship will get you up to speed. A fully modern gravel bike, the USA-made Lugged Earth Ship uses a Chris Bishop-designed lugset with Columbus Life main triangle with Columbus Zona chainstays. The lightweight frame and carbon fork have a 240lb rider weight limit as a result. Built with clearance for 700c x 45mm tires, the frame uses Paragons modular guides which can be customized for AXS, 1x or a 2x setup. Framesets will be offered for $3,400, while complete builds are offered on a personalized basis. FRAME SPECHandbuilt in our Minneapolis workshopWilde Wayfinder Carbon ForkIncludes copper, handcrafted, Jen GreenheadbadgeClearance for 700 x 45c or 650b x 2.1Three bottle mountsTop tube feedbag mountsFender mountsStandard Headtube: EC34/3468mm bottom bracket shellFlat mount brakeRear Thru Axle M12 X 1.5Derailleur Hanger: Paragon B4085Seatpost: 27.2mmCable Guides: Paragon Modular guides under the downtube, and full loop braze-ons on the stays (No Zip Ties)The post Wilde Bicycle Co. Adds Two Lugged Gravel Beauties w/ Classical or Modern Style appeared first on Bikerumor.
    0 Comments 0 Shares 186 Views
  • CYCLINGUPTODATE.COM
    After Three Olympics Medals, Australian Switches To Great Britain
    TheParis 2024 OlympicGamescertainlycreated headlines, but the vast majority again put the spotlight on dedicatedpeople of a sporting persuasion and their achievements, and whatever your ownfavourites might be on a discipline front, there were plenty of moments spreadacross the games that woul...
    0 Comments 0 Shares 150 Views
  • IRISHCYCLE.COM
    Section of Dodder Greenway Pathfinder project delayed until Q2 2025
    Dublin City Council has confirmed that the construction of the Dodder Greenway project between Donnybrook Road and Clonskeagh Road a Pathfinder project aimed at accelerating climate action has been delayed until at least Q2 2025.The council said that this delay is due to design changes required after the public consultation. The projects public consultation was held last year, and it was planned to be in its construction phase by Q3 2024, that is, by the end of September 2024, next month.The projects main element is to make more space for cycling by making Beaver Row one-way for motorists, but now one of the main changes planned is a proposal to expand the two-way traffic system on the Clonskeagh Road side of the route up to the David Lloyd Gym project.At this point, it is unclear how the council proposes to extend the length of two-way traffic access and provide high-quality cycling and walking environments. As the draft design drawings from the original design, it is one of the narrower sections of the route.Cllr Dermot Lacey (Labour) said that councillors have not seen any details of the revised plans but that his main aim is to have the project progressed.He said, I think it would be best to extend the two way for that short stretch as far as David Lloyd Centre. My main aim is that we make progress on this important link in the overall plan, and I will be pushing for this.On the day the public consultation for the project started, IrishCycle.com reported how the plans included low-quality shared paths disconnected from other sections of the Dodder route, which only recently opened.In an update provided to Cllr Lacey, the councils Active Travel Office said it is seeking to reduce shared space and increase connectivity.A council official said: The anticipated start date for construction of the Dodder Greenway from Donnybrook Road to Clonskeagh Road is Q2 2025. The construction timeline has altered due to changes in the design which have arisen from submissions received during the non-statutory Public Consultation.The councils Active Travel Design Office said that it is planning adust its plans to reduce the use of shared space, extend the two-way system to David Lloyd Gym, improve connectivity along the Dodder Greenway, and coordinate with Eirgrid on the installation of high-voltage cable ducting.It said that the planned improved connectivity was to be included at both ends of the route, at the junction of Clonskeagh Road and Beech Hill Road and the junction of Donnybrook Road and Beaver Row.In order to progress the Detailed Design for this section, stakeholder engagement, topographical surveys and ground investigation works are ongoing, an official said.They added: As the project progresses, updates will be provided on the DCC website. The Public Consultation Report and updated Preliminary Design Drawings will also be published on the project webpage when completed.
    0 Comments 0 Shares 247 Views
  • CYCLINGUPTODATE.COM
    PREVIEW | Druivenkoers-Overijse 2024 - Lotto Dstny big favourites for explosive cobbled classic
    On the 23rd of August we have got an explosive hilly classic in the Belgian Ardennes. Druivenkoers-Overijse is one of the many races suited to the classics specialists ahead of the final months of the season and should see an exciting race. We preview the race ahead.The race will be 206 kilometers...
    0 Comments 0 Shares 173 Views
  • CYCLINGUPTODATE.COM
    Michel Hessmann reported to be in contacts with World Tour team despite having been suspended until March
    In an unusual cycling market for Movistar Team, where the team, in the absence of major signings, has prioritized the renewal of several of its most outstanding talents for the future, rumors have emerged that, at the very least, are surprising. Michel Hessmann, officially banned until March 2025, m...
    0 Comments 0 Shares 168 Views
  • CYCLINGUPTODATE.COM
    Everything about Jonas Vingegaard
    Jonas Vingegaard is Danish pro cyclist who is most known for winning the Tour de France. His famous story, from fish factory worker to Tour de France winner in a few years has been incredibly popular, whilst he led the Team Visma | Lease a Bike team to it's ultimate goal in 2022 and 2023.Name: Jona...
    0 Comments 0 Shares 173 Views
  • IRISHCYCLE.COM
    Dublins 1-hour long, music-fuelled Critical Mass to be held on Friday at 6pm
    Dublins 1-hour long, music-fuelled Critical Mass to be held on Firday at 6pmDublins next Critical Mass is to be held tomorrow, Friday August 30th at 6pm.The Critical Mass events in Dublin in recent years are more fun-filled and music-fuelled than tridtional protest cycles under the same name.It is held every month starting on Parnell Square North and taking about an hour around the city centre, and is orginaised by campain grou I Bike Dublin and socal cycle group Monthly Cycles.Friday 30 August, 6pm, Parnell Square, D1.Come join us for #CriticalMass #DublinA follower & a #CriticalMassDub participant made this poster, we it. They placed it at their employers bicycle parking area at their work place. Could you do that too?#IBIKEBop #MonthlyCycles pic.twitter.com/4jbp0eUVx7 I BIKE Dublin (@IBIKEDublin) August 22, 2024
    0 Comments 0 Shares 194 Views
  • CYCLINGUPTODATE.COM
    "I could have gone for more today" - Florian Lipowitz not satisfied with third place as BORA loses the red jersey
    Ben O'Connortook the red jersey in the Vuelta a Espana today with a stunning solo rider from the early breakaway. That breakaway also included Florian Lipowitz, a teammate of the previous red jersey wearer Primoz Roglic. After the stage, the German admitted that he was not intended to be up the roa...
    0 Comments 0 Shares 176 Views
  • CYCLINGUPTODATE.COM
    Second in Vuelta stage 6, Marco Frigo regrets missing Ben O'Connor's winning move: "Otherwise it could have been different"
    It was a long wait afterBen O'Connorcrossed the finish line as the winner of the sixth stage of the Vuelta a Espana. More than four and half minute behind the Australian, it was eventually Israel - Premier Tech's Marco Frigo, who turned up at the finish in Yunquera to grab a second place on the da...
    0 Comments 0 Shares 201 Views